Auxillary Load configuration for water heater
Using the auxiliary load function to heat an immersion heater ….Has anybody managed to set up grid charging using any of the timer settings …. I would like to be able to charge selectively from the grind to take advantage of economy 7 rates when the battery has run down to the set level....the same way as we can charging batteries ….
91 Views

The Aux/Gen port can be use to when there is excess PV power. It is not possible to set a schedule using the SS inverter. The Timer can be used to set up charging from the using 7 differrnt periods.