Wanting to install a second 5.32Kw battery

Hi, I.m looking at installing a second 5.32 battery. Looking at the current instal the cables have been neatly/tightly installed. I understand the second battery is in parallel with the first (Master)?

So my question is, can I just link the "Spare" positive and negative connection to the "Slave" battery, effectively P2 and N2? Or is there something different about these connections internally to the battery?

Also not clear which data connection to use to link the Slave to the Master.

Any advice appreciated. Thanks.

223 Views
Unknown member
Dec 11, 2024

I have the Sunsynk Ecco 5kW Inverter. Max load observed is 7496W