Is an external Meter required ( UK)
With the supplied CT connected does a 8.8kw Ecco Hybrid have its own integral metering or does it require the likes of an external Eastron for full functionality. many thanks
82 Views

With the supplied CT connected does a 8.8kw Ecco Hybrid have its own integral metering or does it require the likes of an external Eastron for full functionality. many thanks
Adding to previous comments the functionality of the supplied CT seems to get worse with cable length to the inverter. If you are only a few meters away try it and see how it works for you. You can always upgrade to a meter at later time.