The 8kW Sunsynk has 2x MPPT's that can handle 18A. Does this mean 2 strings per MPPT in parallel with short circuit current < 9A

Most new panels have a current of over 9A so if only panels with a maximum current below 9A can be used this is a huge problem?

421 Views
weyiman14
Apr 17, 2022

Did you get a response to your question if the 480 max is for both mppt, s together or if the 480 max is per mppt?