Replacing SMA Equipment

I am off grid and have a single phase installation consisting:


Proven 6kW Windturbine 2 strings of Solar Panels - 4kWp in total

20kWh of led actd traction batteries

16.5 kva Diesel generator


Those power sources


6kW SMA Windy Boy, after a SMA inverter and protection box to limit the DC output to 600v

4kW SMA Sunny Boy

With a 5kW SMA Sunny Island (SB5024) controlling all those devices


Monitoring with RS432 and a SMA Sunny Webbox.


The equipment was installed ~20 years ago so is coming to the end of its life.


So my questions are:


Can I replace the equipment with Sunsync inverter/s? And if so which one/s?


If I can use my existing Leasd acid batteries inteh short term (they should be good for anopther 2-5 years.)


Finally. is this the best place to ask or should I email customer servivces?


Thnaks for your paitence and help.

ree





129 weergaven

leden

Sunsynk Logo.png

Aanmelden

Bedankt voor uw inschrijving!

+44 151 832 4300

+27 101 003589

sales@sunsynk.com

support@sunsynk.com

Documenten

Garantievoorwaarden van de fabrikant

Garantievoorwaarden van de fabrikant - Zuid-Afrika

Uitgebreide garantievoorwaarden van de fabrikant

Milieubeheerbeleid

Beleid tegen fraude, omkoping en corruptie

Beleidslijn voor ethische inkoop

RMA Klant Reparatieformulier

RMA Klant Reparatieformulier

Producten

Eénfase hybride omvormer

3,6 kW
3,6 kW Ecco
5,5 kW
5,5 kW Ecco
8,8 kW
8,8 kW Ecco
16 kW

Driefase hybride omvormer

8 kW
10 kW
12 kW
50 kW

Accu's

5,32 kWh
L5.1
L5.3

Hoogspanningsbatterij

Hoogspanningsomvormer

3 Phase 20/25kW

3 Phase 30/50kW

Sunsynk UK Ltd Unit 8, Total Park,

Bennetts Lane, Shell Green, Widnes WA8 0GW

  • Facebook
  • X
  • Youtube
  • LinkedIn
  • Whatsapp

Deel van Sunsynk Group Limited

© 2025 SUNSYNK UK LTD

Geregistreerd in Engeland 8778087

bottom of page