Batteries not charged by generator when grid off

2 X 12Kw Sunsynk 3 Phase in parallel. 20Kwa diesel generator. Phases connected in identical order. Not connected to aux- but to simply function as grid back-up. When grid goes off, ac light goes off. Generator starts, change over & ac light comes on, but inverter does not take load and batteries are not charged despite Hz, volt etc within parameters. When grid comes on again, despite switch over from generator to grid, normal function i.e. battery charging, only resumes after generator completely stops, having run through it cooling off period. Any idea what the problem can be?

166 weergaven
Groots
Feb 01, 2024

Gald you have resolved it. Working with generators can be a bit of a challenge.

leden

Sunsynk Logo.png

Aanmelden

Bedankt voor uw inschrijving!

+44 151 832 4300

+27 101 003589

sales@sunsynk.com

support@sunsynk.com

Documenten

Garantievoorwaarden van de fabrikant

Garantievoorwaarden van de fabrikant - Zuid-Afrika

Uitgebreide garantievoorwaarden van de fabrikant

Milieubeheerbeleid

Beleid tegen fraude, omkoping en corruptie

Beleidslijn voor ethische inkoop

Beleidslijn voor ethische inkoop

RMA Klant Reparatieformulier

RMA Klant Reparatieformulier

Producten

Eénfase hybride omvormer

3,6 kW
3,6 kW Ecco
5,5 kW
5,5 kW Ecco
8,8 kW
8,8 kW Ecco
16 kW

Driefase hybride omvormer

8 kW
10 kW
12 kW
50 kW

Accu's

5,32 kWh
L5.1
L5.3

Hoogspanningsbatterij

Hoogspanningsomvormer

3 Phase 20/25kW

3 Phase 30/50kW

Sunsynk UK Ltd Unit 8, Total Park,

Bennetts Lane, Shell Green, Widnes WA8 0GW

  • Facebook
  • X
  • Youtube
  • LinkedIn
  • Whatsapp

Deel van Sunsynk Group Limited

© 2025 SUNSYNK UK LTD

Geregistreerd in Engeland 8778087

bottom of page