Peak Power(off-grid): 2 times of rated power, 10 S.
AC Output Rated Current(A): 18A
Max.AC Current(A): 27A
Max Continuous AC Pass-through(A): 50A.
This is an extract from a 12-kW 3-phase inverter. Can Sunsynk clarify if this 12-kW is total or is per phase? There are also 3 AC current ratings (i.e. 18A, 27A and 50A). I suppose the current that you use for design is 50-A (Max cont. AC Pass-through)?
Rated AC Output and UPS Power (W): 12000W
Max AC Output Power (W): 13200W
Peak Power(off-grid): 2 times of rated power, 10 S.
AC Output Rated Current(A): 18A
Max.AC Current(A): 27A
Max Continuous AC Pass-through(A): 50A.
This is an extract from a 12-kW 3-phase inverter. Can Sunsynk clarify if this 12-kW is total or is per phase? There are also 3 AC current ratings (i.e. 18A, 27A and 50A). I suppose the current that you use for design is 50-A (Max cont. AC Pass-through)?
Can 2 inverters working in parallel control one battery set?