Schematic check

Hi All! Can anyone see any problems with this system design? Its for the UK and needs to maximise solar export at all times (12p/kWh) and charge batteries for 5 hours overnight (4.5p/kWh). The attached existing FIT system needs to produce as much as possible and pass this through to export. Max load on UPS is 33A. Any comments welcome!


Thanks!


ree

122 Views
Pip
Pip
Jun 15, 2023

David it is important to factor in a) losses due to charging and then discharging- typically 13% and then b) the deprecation cost of the battery due to the charge / discharge cycling your scheme will induce. You won't make the full 7.5p /kWh profit that you think.


Steve did some research about this, it may be worth a look at this thread https://www.sunsynk.org/forum/techical-support/effect-of-discharge-rate-and-dod-on-battery-life

Members

  • Piter Freide
    Piter Freide
  • Will Smith
    Will Smith
  • Rohit Rajput
    Rohit Rajput
  • Andrew Zarudnyi
    Andrew Zarudnyi
  • Tommy Cooper
    Tommy Cooper
bottom of page