Hi All! Can anyone see any problems with this system design? Its for the UK and needs to maximise solar export at all times (12p/kWh) and charge batteries for 5 hours overnight (4.5p/kWh). The attached existing FIT system needs to produce as much as possible and pass this through to export. Max load on UPS is 33A. Any comments welcome!
Thanks!

122 Views

David it is important to factor in a) losses due to charging and then discharging- typically 13% and then b) the deprecation cost of the battery due to the charge / discharge cycling your scheme will induce. You won't make the full 7.5p /kWh profit that you think.
Steve did some research about this, it may be worth a look at this thread https://www.sunsynk.org/forum/techical-support/effect-of-discharge-rate-and-dod-on-battery-life