UK Island Mode Installation and Installer (North Wales)

I have the 8k Ecco Hybrid but I haven't managed to find an installer to finish the installation and make island mode, it's just running the batteries and zero export.

Tried and failed to get a local installer, perhaps part of the reason is I can't specify what switching between the inverter and the mains is needed in Island mode.

I know I will need an earth spike, but what do I need for the isolation? Does the built in switching cover this?

If you know of an istaller that might do it for us that would be great.

Does anyone have diagrams of a UK compliant islanding set up please?

Pete

158 Views
Geoff Jones
Mar 12, 2023

its part of the MCG contactor, pin L3 / T4, I have used 16mm earth from the earth bus to copper rod outside via the contactor