2 × 3phase 12Kw Sunsynk inverters in parallel. 9Kw on each Mppt 1. When slave's PV is higher than that connected to master, then load is taken from (combined) PV & any shortage from grid, and not from the batteries, despite the batteries being100% full. Why?