top of page

Technical Support

Public·332 members

Suggestion. Scheduling battery dumping!

For each time slot could we have a Max and Min SoC?


If it enters a slot and the charge is above the max it dumps until the max is reached then goes back to running off the battery until the Min is reached when it goes back to grid as ot does now


Seems simple enough to implement and would work really well for the new Flux tariff on octopus..


At the moment it had to be fine manually every day



98 Views
thebaps1
thebaps1
2023년 5월 30일

I think I see your point, you may want to export down to say 80%, but you also want to allow the battery to supply loads down to 20%. That would require a second threshold value i.e. a min export SoC and a supply load until SoC. Which I think is what you were suggesting!

Members

  • Piter Freide
    Piter Freide
  • Will Smith
    Will Smith
  • Rohit Rajput
    Rohit Rajput
  • Andrew Zarudnyi
    Andrew Zarudnyi
  • Tommy Cooper
    Tommy Cooper
bottom of page