G100 export limit

Hi, I’ve recently installed an 8kW ECCO hybrid inverter. The DNO have requested a load limit on export of 4kW. How would I do this please? Thank you.

58 Views
Groots
2024年7月20日

Do you want to use the Sunsynk Connect portal or the console on the inverter?