G100 export limit
Hi, I’ve recently installed an 8kW ECCO hybrid inverter. The DNO have requested a load limit on export of 4kW. How would I do this please? Thank you.
58 Views

Hi, I’ve recently installed an 8kW ECCO hybrid inverter. The DNO have requested a load limit on export of 4kW. How would I do this please? Thank you.
Do you want to use the Sunsynk Connect portal or the console on the inverter?