top of page

Technical Support

Public·332 members

How to setup "Absorption Time" in Sunsynk Inverter

I have 2 5kW Lithium batteries which i need to charge to 100% at 55.6V, carry out absorption at 55.6V for 30min the current drops to 2A for both batteries and then switch to float voltage of 53.6V until the battery is used.


I have looked through the 5kW inverter and i cannot seem to find the absorption time, how do i setup my battery for charging as above?

76 Views
jacekowski
Apr 10, 2024

BMS should command whatever voltage and current it needs and inverter will deliver requested voltages/currents.

Members

  • Piter Freide
    Piter Freide
  • Will Smith
    Will Smith
  • Rohit Rajput
    Rohit Rajput
  • Andrew Zarudnyi
    Andrew Zarudnyi
  • Tommy Cooper
    Tommy Cooper
bottom of page