top of page

Sunsynk Group

Public·72 members

Philip Williams
Philip Williams

Replacing SMA Equipment

I am off grid and have a single phase installation consisting:


Proven 6kW Windturbine 2 strings of Solar Panels - 4kWp in total

20kWh of led actd traction batteries

16.5 kva Diesel generator


Those power sources


6kW SMA Windy Boy, after a SMA inverter and protection box to limit the DC output to 600v

4kW SMA Sunny Boy

With a 5kW SMA Sunny Island (SB5024) controlling all those devices


Monitoring with RS432 and a SMA Sunny Webbox.


The equipment was installed ~20 years ago so is coming to the end of its life.


So my questions are:


Can I replace the equipment with Sunsync inverter/s? And if so which one/s?


If I can use my existing Leasd acid batteries inteh short term (they should be good for anopther 2-5 years.)


Finally. is this the best place to ask or should I email customer servivces?


Thnaks for your paitence and help.

ree





129 Views

Members

bottom of page